Category
Manufacturing
GM signs 15-year solar energy deal that will power 3 U.S. plants
Share
Expand
An aerial view of the NorthStar’s Newport Solar project in Newport, Ark., which will support the electricity needs of GM plants in Michigan and Missouri.
(GM)
Author
By:
Georgia Hall
August 15, 2024 01:27 PM
Featured Stories
Nameplates that went out of production in 2024
Image
Tesla market value surges $570 billion as Elon Musk joins Trump’s inner circle
Image
Could Honda-Nissan be the new Japanese juggernaut, or just ‘coalition of the weak’?
Image
Dealership’s outreach method boosts Internet closing ratio
Image